subject
Engineering, 30.10.2021 23:30 gracieorman4

seramai 2 orang pekerjs bertungkus lumus menghasilkan bakul dalam tempoh 2 hari dengan kadar upah sebanyak RM5.00 sehari. Hitungkan kos upah yang perlu dibayar kepada pekerja.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 18:10
Which of the following ziegler nichols tuning methods the response of the controller to a step input should exhibit an s-shaped curve? a)-open loop mode b)-closed loop mode c)-both modes (open & closed) d)-none of the modes (open & closed)
Answers: 3
question
Engineering, 04.07.2019 18:20
Atank with constant volume contains 2.27 kg of a mixture of water phases (liquid-vapor). in the initial state the temperature and the quality are 127 °c and 0.6, respectively. the mixture is heated until the temperature of 160 oc is reached. illustrate the process in a t-v diagram. then, determine (1) the mass of the vapor in kg at the initial state, (2) the final pressure in kpa.
Answers: 3
question
Engineering, 04.07.2019 19:10
In general, how do thermosetting plastics compare to thermoplastics in mechanical and physical properties?
Answers: 3
You know the right answer?
seramai 2 orang pekerjs bertungkus lumus menghasilkan bakul dalam tempoh 2 hari dengan kadar upah se...
Questions
Questions on the website: 13722361