subject
Engineering, 25.10.2021 07:30 savannahvargas512

Q9 : Assume the Following Process. Process Burst Time Priority Arrival Time
P1 16 3 0
P2 3 1 5
P3 5 5 8
P4 6 4 4
P5 11 2 6
For the set of processes directly above, draw a Gantt chart for the Round Robin
Scheduling Algorithm using. CS=0
a) For the set of processes directly above, draw a Gantt chart for the the Round
Robin Algorithm for a time quantum of q= 5 ms.
b) For the set of processes directly above, calculate the throughput for the
Round Robin Algorithm for a time quantum of 5 ms.
c) For the set of processes directly above, calculate the turnaround time for the
Round Robin Algorithm for a time quantum of 5 ms.
d) For the set of processes directly above, calculate the average turnaround
time for the Round Robin Algorithm for a time quantum of 5 ms.
e) For the set of processes directly above, calculate the waiting time for the
Round Robin Algorithm for a time quantum of 5 ms.
f) For the set of processes directly above, calculate the average waiting
time for the Round Robin Algorithm for a time quantum of 5 ms.
g) What will happen if the time quantum for the Round Robin Algorithm is too
small?
h) What will happen if the time quantum for the Round Robin Algorithm is too
large?
i) What is the CPU Utilization for the system?
Q 10: Repeat Q9 with CS=1

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Heat is added to a piston-cylinder device filled with 2 kg of air to raise its temperature 400 c from an initial temperature of t1 27 cand pressure of pi 1 mpa. the process is isobaric process. find a)-the final pressure p2 b)-the heat transfer to the air.
Answers: 1
question
Engineering, 04.07.2019 18:10
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
question
Engineering, 04.07.2019 18:20
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
question
Engineering, 04.07.2019 18:20
Apiston-cylinder device contains 0.1 m3 of liquid water and 0.9 m3 of water vapor in equilibrium at 800 kpa. heat is transferred at constant pressure until the temperature of water reaches 350 °c. determine (a) the quality of water at the initial state (b) the work associated with this process, (c) the heat associated with this process.
Answers: 2
You know the right answer?
Q9 : Assume the Following Process. Process Burst Time Priority Arrival Time
P1 16 3 0
...
Questions
Questions on the website: 13722361