subject
Engineering, 20.10.2021 14:00 mamieengler

Fossils of seashells and fish are sometimes found on top of mountains. What can you infer about this discovery?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Amass of 1.5 kg of air at 120 kpa and 24°c is contained in a gas-tight, frictionless piston-cylinder device. the air is now compressed to a final pressure of 720 kpa. during the process, heat is transferred from the air such that the temperature inside the cylinder remains constant. calculate the boundary work input during this process.
Answers: 2
question
Engineering, 04.07.2019 18:10
Refrigerant 134a enters an insulated compressor operating at steady state as saturated vapor at -26°c with a volumetric flow rate of 0.18 m3/s. refrigerant exits at 9 bar, 70°c. changes in kinetic and potential energy from inlet to exit can be ignored. determine the volumetric flow rate at the exit, in m3/s, and the compressor power, in kw.
Answers: 1
question
Engineering, 04.07.2019 19:10
Afoot bridge is made as a simple deck, 4 m long, with a cross section 2 m (wide) and 20 cm thick, and made of wood. the deck is supported at the two ends. the maximum load allowable on the bridge is 10 tons, provided it is uniformly distributed on the deck. to sense this load, a strain gauge is placed at the center of the bridge and its resistance is monitored. if the sensor has a nominal resistance of 350 s2 and a gauge factor of 3.6, what is the reading of the strain gauge at maximum load? the modulus of elasticity for the wood used in the construction is 10 gpa.
Answers: 2
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
Fossils of seashells and fish are sometimes found on top of mountains. What can you infer about this...
Questions
question
Mathematics, 06.07.2019 16:30
question
Geography, 06.07.2019 16:30
Questions on the website: 13722363