Engineering, 19.10.2021 23:40 bacchus6663

When performing a diode test it is necessary to: A) Connect the meter leads to each end of the diode and then reverse the leads.
B) Place the black plug on meter lead into the 10A jack
C) Connect the diode to a 12 volt battery.
D) Place the red plug on the meter lead into the 10A jack.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
question
Engineering, 04.07.2019 19:20
The power source in a certain welding setup generates 3500w that is transferred to the low carbon steel work with a heat transfer factor of 0.85. the melting factor in the operation is 0.45. a continuous fillet weld is to be made with a cross-sectional area of 23 mm2 determine the travel speed at which the welding can be accomplished.
Answers: 3
question
Engineering, 04.07.2019 19:20
List 3 options on how to reduce knocking problens during engine process,
Answers: 2
question
Engineering, 06.07.2019 04:10
Areheat rankine cycle operates with water as the working fluid. steam enters the first turbine at 8 mpa and 450°c and exits at 0.8 mpa. it is then reheated to 400°c before entering the second turbine, where it exits at 10 kpa. if the amount of work into the pump is 8.04 kj/kg and the net work per cycle produced is 1410.25 kj/kg, determine the thermal efficiency of the cycle.