subject
Engineering, 19.10.2021 14:00 natalie2sheffield

Compute the average hourly cost of a bricklayer to a contractor. He works 6 days, 10 hours a day. In addition to time and a half for overtime Monday through Thursday, the contract calls for double time for all work on Fridays and weekends. Use 7.65% FICA and 5% for unemployment insurance. The contractor requires $50,000/100,000 coverage for Public liability and property damage insurance. Assume all data relating to the WC, PL, PD, fringes, and wage rates are as given in the provided table.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 23:20
Two technicians are discussing the intake air temperature (iat) sensor. technician a says that the computer uses the iat sensor as a backup to the engine coolant temperature (ect) sensor. technician b says that the powertrain control module (pcm) will subtract the calculated amount of fuel if the air measures hot. who is correct
Answers: 3
question
Engineering, 04.07.2019 18:10
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
question
Engineering, 04.07.2019 18:10
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
question
Engineering, 04.07.2019 18:10
Machinery that is a key part of the process and without which the plant or process cannot function is classifed as: (clo4) a)-critical machinery b)-essential machinery c)-general purpose machinery d)-none of the specified options.
Answers: 1
You know the right answer?
Compute the average hourly cost of a bricklayer to a contractor. He works 6 days, 10 hours a day. In...
Questions
question
English, 18.03.2021 02:00
question
Business, 18.03.2021 02:00
question
Chemistry, 18.03.2021 02:00
question
Social Studies, 18.03.2021 02:00
Questions on the website: 13722363