subject
Engineering, 17.10.2021 06:30 Queiao4088

2. Rain gauge D was out of operation for a month. Estimate the amount of rainfall (mm) for a gauge D.


2. Rain gauge D was out of operation for a month. Estimate the amount of rainfall (mm) for a gauge

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
Which from the following instrument is commonly used to detect the high pitch butzing sound in bearings? [clo4] a)-digital ultrasonic meter b)-infrared camera c)-spectroscopic d)-vibrometer
Answers: 2
question
Engineering, 06.07.2019 04:10
Aheat pump with refrigerant-134a as the working fluid is used to keep a space at 25°c by absorbing heat from geothermal water that enters the evaporator at 500c at a rate of 0.065 kg/s and leaves at 40°c. the refrigerant enters the evaporator at 20°c with a quality of 23 percent and leaves at the inlet pressure as saturated vapor. the refrigerant loses 300 w of heat to the surroundings as it flows through the compressor and the refrigerant leaves the compressor at 1.4 mpa at the same entropy as the inlet. determine: (a) the degrees of subcooling of the refrigerant in the condenser, b)-the mass flow rate of the refrigerant . (c) the heating load and the cop of the pump, and d)-the theoretical minimum power input to the compressor for the same heating load.
Answers: 3
You know the right answer?
2. Rain gauge D was out of operation for a month. Estimate the amount of rainfall (mm) for a gauge D...
Questions
question
Business, 22.09.2019 19:00
question
Computers and Technology, 22.09.2019 19:10
Questions on the website: 13722363