The B/C ratio for a new flood control project along the bank of Chao Phraya River is required to be 1.2. If the benefit is estimated at $520,000 per year and the maintenance cost is expected to total $320,000 per year, what is the allowed maximum initial cost of the project? The discount rate is 6.5% per year and a project life of 40 years is expected

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Heat is added to a piston-cylinder device filled with 2 kg of air to raise its temperature 400 c from an initial temperature of t1 27 cand pressure of pi 1 mpa. the process is isobaric process. find a)-the final pressure p2 b)-the heat transfer to the air.
Answers: 1
question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:20
Acertain flow of air (at stp) has a velocity distribution given by v i (in ft/s). if this flow is going through a 4 ft square area in the yz-plane (centered at the origin), what is the mass flow rate (in lbm/s)?
Answers: 2
You know the right answer?
The B/C ratio for a new flood control project along the bank of Chao Phraya River is required to be...
Questions
question
Mathematics, 20.04.2020 04:17
question
Mathematics, 20.04.2020 04:17
question
Mathematics, 20.04.2020 04:17
Questions on the website: 13722361