Engineering, 12.09.2021 06:20 maylasia

The B/C ratio for a new flood control project along the bank of Chao Phraya River is required to be 1.2. If the benefit is estimated at $520,000 per year and the maintenance cost is expected to total $320,000 per year, what is the allowed maximum initial cost of the project? The discount rate is 6.5% per year and a project life of 40 years is expected.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 18:20
How much power could a wind turbine produce if it had the following specifications? cp = 0.45 -d=1.2kg/m3 d=50m v 5m/s
Answers: 2
question
Engineering, 04.07.2019 19:10
10 kg of co2 is initially contained at 400 kpa and 300 k. the gas constant for carbon dioxide is 189 j/lkg k) and has a specific heat ratio, k, of 1.289. isentropic expansion then occurs until the pressure is 200 kpa. a) determine the initial volume of co2 in m. b) determine the final temperature in k. c) determine the work done by the system during the expansion kl.
Answers: 2
question
Engineering, 04.07.2019 19:10
The sum of the normal stresses does not change as the stress state rotates through an angle. a)-trune b)- false
Answers: 2
You know the right answer?
The B/C ratio for a new flood control project along the bank of Chao Phraya River is required to be...
Questions
question
Arts, 07.06.2021 23:10
question
Mathematics, 07.06.2021 23:10
question
Mathematics, 07.06.2021 23:10
Questions on the website: 13722363