subject
Engineering, 07.09.2021 05:00 ruslffdr

En una empresa de galletas se producen 200 cajas por cada 100 costales de harina. Diariamente se compran 100 costales, y por cada uno se usan 6 horas de mano de obra para procesarse. Un nuevo proveedor asegura que por la calidad de su harina pueden sacar 220 cajas de galletas, pero aumentarían 6 horas de mano obra por día. ¿Cuál sería su nueva productividad?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 18:10
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
question
Engineering, 04.07.2019 18:10
Carbon dioxide gas expands isotherm a turbine from 1 mpa, 500 k at 200 kpa. assuming the ideal gas model and neglecting the kinetic and potential energies, determine the change in entropy, heat transfer and work for each kilogram of co2.
Answers: 2
question
Engineering, 04.07.2019 18:20
Atank with constant volume contains 2.27 kg of a mixture of water phases (liquid-vapor). in the initial state the temperature and the quality are 127 °c and 0.6, respectively. the mixture is heated until the temperature of 160 oc is reached. illustrate the process in a t-v diagram. then, determine (1) the mass of the vapor in kg at the initial state, (2) the final pressure in kpa.
Answers: 3
You know the right answer?
En una empresa de galletas se producen 200 cajas por cada 100 costales de harina. Diariamente se com...
Questions
question
Geography, 23.04.2020 00:49
Questions on the website: 13722367