The top-down method of estimating project time and costs that is useful for projects requiring the same task, group of tasks, or product repeated several times, especially if it is labor intensive, is the . a) function point
b) ratio
c) apportion
d) consensus
e) learning curves

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Air is to be cooled in the evaporator section of a refrigerator by passing it over a bank of 0.8-cm-outer-diameter and 0.4-m-long tubes inside which the refrigerant is evaporating at -20°c. air approaches the tube bank in the normal direction at 0°c and 1 atm with a mean velocity of 4 m/s. the tubes are arranged in-line with longitudinal and transverse pitches of sl- st 1.5 cm. there are 30 rows in the flow direction with 15 tubes in each row. determine (a) the refrigeration capacity of this system and (b) pressure drop across the tube bank. evaluate the air properties at an assumed mean temperature of -5°c and 1 atm. is this a good assumption?
Answers: 1
question
Engineering, 04.07.2019 18:20
Derive the correction factor formula for conical nozzle i=-(1+ cosa) and calculate the nozzle angle correction factor for a nozzle whose divergence hal-fangle is 13 (hint: assume that all the mass flow originates at the apex of the cone.
Answers: 3
question
Engineering, 06.07.2019 03:20
What is the strain energy stored in a solid uniformly circular shaft of length 3.0 m and diameter 120 mm when subject to pure torsion if the maximum shear stress is 40 mpa? g-80gpa
Answers: 1
question
Engineering, 06.07.2019 05:30
There is a metal plate with thickness, thermal conductivity, density, and specific heat of 10 mm, 200 w/m.°c, 2500 kgrn3, and 900 j/kg.k, respectively. it has an initial uniform temperature of 22°c and is being heated in an oven for 2 minutes. air in the oven is maintained at 900 c with convection heat transfer coefficient of 190 w/m.k. determine the temperature of the plate when it is removed from the oven.
Answers: 3
You know the right answer?
The top-down method of estimating project time and costs that is useful for projects requiring the s...
Questions
question
Mathematics, 04.02.2021 22:10
question
Mathematics, 04.02.2021 22:10
question
Mathematics, 04.02.2021 22:10
question
Mathematics, 04.02.2021 22:10
question
Chemistry, 04.02.2021 22:10
Questions on the website: 13722367