subject
Engineering, 03.08.2021 16:00 HarryPotter10

A company is using 2 outdoor ponds to reduce organic material from a 500. gallons/hour wastewater stream. In the current situation, the ponds have a surface area of 1 acre (first pond) and 3.1 acres (second pond) (1 acre = 43,560 ft2) and both have an average depth of 6.0 ft. Arranged in series with the outflow from the first pond feeding the second pond, the system removes 95% of the organic material by mass. Evaporation of water is 25 gallons per acre per hour. Since the reaction is highly dependent on oxygen levels, both ponds are aerated, and the bubbling thoroughly mixes the water in each pond. The chemical decay reaction is first order. Required:
Estimate the decay coefficient of the organics in the existing pond set.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
question
Engineering, 04.07.2019 18:10
Consider a large isothermal enclosure that is maintained at a uniform temperature of 2000 k. calculate the emissive power of the radiation that emerges from a small aperture on the enclosure surface. what is the wavelength ? , below which 10% of the emission is concentrated? what is the wavelength ? 2 above which 10% of the emission is concentrated? determine the wavelength at which maximum spectral emissive power occurs. what is the irradiation incident on a small object placed inside the enclosure?
Answers: 2
question
Engineering, 04.07.2019 18:10
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
You know the right answer?
A company is using 2 outdoor ponds to reduce organic material from a 500. gallons/hour wastewater st...
Questions
question
English, 25.09.2019 15:00
question
Mathematics, 25.09.2019 15:00
question
Mathematics, 25.09.2019 15:00
question
Mathematics, 25.09.2019 15:00
question
Biology, 25.09.2019 15:00
Questions on the website: 13722367