subject
Engineering, 30.07.2021 01:30 tiffxnnyyy

Consider a four-station line in which all stations consists of single machines. Station 2 has average processing times of 2 hours per job, while the remaining stations have average processing times of 1 hour per job. Answer the following, under the assumption that process times are deterministic (as in the best case). a). What are rb and To for this line?
b). How do rb and To change if a second identical machine is added to station 2? What effects will this have on performace?
c). How do rb and To change if the machine at station 2 is speeded up to have average processing times of 1 hour? What effects will this have on performance?
d). How do rb and To change if a second, identical machine is added to station 1? What effects will this have on performance?
e). How do rb and To change if the machine at station 1 is speeded up to have average processing times of 1/2 hour? What effects will this have on performance? Do your results agree or disagree with the statement "An hour saved at a nonbottleneck is a mirage (i. e., of no value)"?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
question
Engineering, 04.07.2019 18:10
Which from the following instrument is commonly used to detect the high pitch butzing sound in bearings? [clo4] a)-digital ultrasonic meter b)-infrared camera c)-spectroscopic d)-vibrometer
Answers: 2
question
Engineering, 04.07.2019 18:10
Courses that are developed by subject matter experts, internal or extemal to the college or university. these programs are marketed by the school (clo2) marks a)-vocational schools b)-vendor training c)-colleges & universities d)-continuing education programs
Answers: 2
question
Engineering, 04.07.2019 18:20
The characteristic roots of a dynamic system are: 1.7920 1.8160 i, -1.7920 1.8160 i, -0.4160 what is the order of this system? what are the settling time and damping ratio of the system?
Answers: 3
You know the right answer?
Consider a four-station line in which all stations consists of single machines. Station 2 has averag...
Questions
question
Mathematics, 16.04.2021 19:20
question
Mathematics, 16.04.2021 19:20
question
Geography, 16.04.2021 19:20
Questions on the website: 13722361