An asphalt concrete mixture includes 94% aggregate by total weight. The aggregates consist material passing the 3/8” sieve (94.7%) while materials passing the No. 200 sieve is to be used as the filler (5.3%). The specific gravities of aggregate, filler and asphalt are 2.635, 2.784 and 1.088 respectively if the bulk density of the mix is 147 pcf, determine: 1. Percentage voids in total mix
2. Percentage voids in mineral aggregate
3. Percentage voids with asphalt

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Apiston-cylinder with a volume of 0.25 m3 holds 1 kg of air (r 0.287 k/kgk) at a temperature of 100 c. heat transfer to the cylinder causes an isothermal expansion of the piston until the volume triples. how much heat is added to the piston-cylinder?
Answers: 3
question
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
question
Engineering, 04.07.2019 18:20
Air is compressed isentropically from an initial state of 300 k and 101 kpa to a final temperature of 1000 k. determine the final pressure using the following approaches: (a) approximate analysis (using properties at the average temperature) (b) exact analysis
Answers: 1
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
You know the right answer?
An asphalt concrete mixture includes 94% aggregate by total weight. The aggregates consist material...
Questions
question
Biology, 12.02.2022 23:00
question
English, 12.02.2022 23:00
question
Mathematics, 12.02.2022 23:00
question
Business, 12.02.2022 23:00
question
Mathematics, 12.02.2022 23:10
Questions on the website: 13722359