subject
Engineering, 07.06.2021 14:00 rouchedavisin4

Two delivery methods have been proposed for a standard delivery method for new bridge constructions in Oregon to overcome traditional design-bid-build models that do not adequately account for site conditions and constructability, and often lead to additional expenses. One alternative must be selected to represent the delivery method specified in the RFP. Based on data from recent bridge construction projects of comparable size, we can estimate the savings from reduced redesign costs, risk management costs, and overhead costs during the life of the construction contract over the traditional delivery model. The estimated costs of a 18-month contract are the following: Alternative Construction manager /General contractor Design-Build Preconstruction and design costs $80,000 $90000 Monthly savings $4000 $6500 Project life, months 18 18 Which alternative should be selected based on the future worth method? Use a MARR of 4%, compounded monthly. Assume other benefits and costs are negligible.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 03.07.2019 14:10
Amass of m 1.5 kg of steam is contained in a closed rigid container. initially the pressure and temperature of the steam are: p 1.5 mpa and t 240°c (superheated state), respectively. then the temperature drops to t2= 100°c as the result of heat transfer to the surroundings. determine: a) quality of the steam at the end of the process, b) heat transfer with the surroundings. for: p1.5 mpa and t 240°c: enthalpy of superheated vapour is 2900 kj/kg, specific volume of superheated vapour is 0. 1483 m/kg, while for t 100°c: enthalpy of saturated liquid water is 419kj/kg, specific volume of saturated liquid water is 0.001043m/kg, enthalpy of saturated vapour is 2676 kj/kg, specific volume of saturated vapour is 1.672 m/kg and pressure is 0.1 mpa.
Answers: 3
question
Engineering, 04.07.2019 18:10
Adouble-strand no. 60 roller chain is used to transmit power between a 13-tooth driving sprocket rotating at 300 rev/min and a 52-tooth driven sprocket. a) what is the allowable horsepower of this drive? b) estimate the center-to-center distance if the chain length is 82 pitches. c) estimate the torque and bending force on the driving shaft by the chain if the actual horsepower transmitted is 30 percent less than the corrected (allowable) power.
Answers: 3
question
Engineering, 04.07.2019 18:10
At 12 noon, the count in a bacteria culture was 400; at 4: 00 pm the count was 1200 let p(t) denote the bacteria cou population growth law. find: (a) an expression for the bacteria count at any time t (b) the bacteria count at 10 am. (c) the time required for the bacteria count to reach 1800.
Answers: 1
You know the right answer?
Two delivery methods have been proposed for a standard delivery method for new bridge constructions...
Questions
question
History, 06.04.2020 03:25
question
Mathematics, 06.04.2020 03:25
question
English, 06.04.2020 03:25
question
Biology, 06.04.2020 03:25
question
Mathematics, 06.04.2020 03:25
Questions on the website: 13722367