subject
Engineering, 24.05.2021 18:50 coolfreekid3

A new development is being proposed over a 10-acre site. The developer wants to divide the site into 40 lots and have a single-family home at each lot. Each home will take about 40% of the lot size. 30% of the lot will be landscaped with shrubs, the rest of the lot will be lawns and sidewalks. After finishing developing the site, the first rainfall of the season hits the development. The rainfall lasted for 3 hours with an average of 0.51 in/hr. Geotechnical report prepared as part of the city permit requirement showed that the initial infiltration was 0.32 in/hr, the final was 0.15 in/hr, and decay constant was 0.15 hr-1.
Some residents complained that there was water accumulated at their properties which caused some damages. Residents threatened to take legal action against the developer. The developer hired you to investigate what happened.
a) What is the interception?
b) What is the infiltration?
c) In your opinion and based on your analysis, do you believe that the residents allegations are founded? Why or why not?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 18:10
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
question
Engineering, 04.07.2019 18:10
Water at 55c flows across a flat plate whose surface temperature is held constant at 95c. if the temperature gradient at the plate's surface for a given value of x is 18 c/mm, find a) local heat transfer coefficient. b) heat flux
Answers: 3
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
You know the right answer?
A new development is being proposed over a 10-acre site. The developer wants to divide the site into...
Questions
question
History, 26.11.2020 19:20
question
Biology, 26.11.2020 19:20
question
Computers and Technology, 26.11.2020 19:20
question
Social Studies, 26.11.2020 19:20
question
Chemistry, 26.11.2020 19:20
question
English, 26.11.2020 19:20
Questions on the website: 13722360