subject
Engineering, 13.05.2021 14:00 cathydaves

Peter Reyes, a marketing surveyor, found out that it takes a total of 151 minutes for 10 persons to complete a particular questionnaire he made. He applied a performance rating of 115% and there is an allowance of 23% added to the normal time. What is the standard time for this particular job?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
question
Engineering, 04.07.2019 18:10
At 12 noon, the count in a bacteria culture was 400; at 4: 00 pm the count was 1200 let p(t) denote the bacteria cou population growth law. find: (a) an expression for the bacteria count at any time t (b) the bacteria count at 10 am. (c) the time required for the bacteria count to reach 1800.
Answers: 1
question
Engineering, 04.07.2019 18:10
Which from the following instrument is commonly used to detect the high pitch butzing sound in bearings? [clo4] a)-digital ultrasonic meter b)-infrared camera c)-spectroscopic d)-vibrometer
Answers: 2
question
Engineering, 04.07.2019 18:20
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
You know the right answer?
Peter Reyes, a marketing surveyor, found out that it takes a total of 151 minutes for 10 persons to...
Questions
question
Mathematics, 10.04.2020 23:33
question
Mathematics, 10.04.2020 23:33
question
Computers and Technology, 10.04.2020 23:33
question
Mathematics, 10.04.2020 23:36
Questions on the website: 13722362