subject
Engineering, 07.05.2021 04:10 MaiiR01

g adjust the proportional, derivative, and integral gains to achieve a settling time of 3 s and meet the previous requirements: 1.2 second peak time, less than 20% overshoot, less than 10% steady-state error. If the peak time is too slow, increase the proportional gain. If the overshoot is too high, increase derivative gain. If making those changes causes too much steady state error, increase the integral gain. Can you find gains to meet all requirements

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 04.07.2019 18:10
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
You know the right answer?
g adjust the proportional, derivative, and integral gains to achieve a settling time of 3 s and meet...
Questions
question
Mathematics, 12.03.2021 20:10
question
Mathematics, 12.03.2021 20:10
question
Social Studies, 12.03.2021 20:10
question
Mathematics, 12.03.2021 20:10
question
Mathematics, 12.03.2021 20:10
Questions on the website: 13722361