subject
Engineering, 25.04.2021 08:00 veritoburito

Tamara has received multiple bids from general contractors to install a new pool in her backyard. How should she go about selecting which contractor to use? 1.She should ignore the bids and rely on online reviews from past clients.
2.She should sign with whoever bid the least amount of money.
3. She should weigh the cost of the bid with the services offered.
4. She should sign with whoever can handle the project independently without her input.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
question
Engineering, 04.07.2019 18:20
What is the heat treatment of metals? what is the benefit of it? why and how it's useful? answer in details, do not write by hand.
Answers: 3
question
Engineering, 04.07.2019 18:20
Water vapor initially at 10 bar and 400 °c is contained within a piston-cylinder assembly. the water lost heat to the surrounding according to isochoric (iso-volumetric) process until its temperature is 150 °c. the water is then condensed isothermally to saturated liquid. for the water as a system, calculate the work in kj/kg
Answers: 2
question
Engineering, 04.07.2019 19:10
Agas is compressed from vi 0.3 m, p 1 bar to of v2 0.1 m3, p2--3 bar. pressure and volume are related linearly during the process. for the gas, find the work, in kj.
Answers: 2
You know the right answer?
Tamara has received multiple bids from general contractors to install a new pool in her backyard. Ho...
Questions
question
History, 22.06.2019 17:00
Questions on the website: 13722367