25 The following Information is available for a factory,
Daily working hours
8
Number of working days in week(s) 6
No of operators 20
Std. Hours per unit of production during a particular week 4
Number of units produced
48
Absentee man days
Idle time due to loadshedding
30 man darys
Find
i) Absenteeism percentage
ii) Labour utilisation percentage
iii) production efficiency of labour
iv) Overall productivity of labour in terms of units produced/week/
employee​

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
question
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
question
Engineering, 04.07.2019 18:20
Ahe-xe mixture containing a 0.75 mole fraction of helium is used for cooling electronics in an avionics application. at a temperature of 300 k and atmospheric pressure, calculate the mass fraction of helium and the mass density, molar concentration and molecular weight of the mixture. if the cooling capacity is 10 l, what is the mass of the coolant?
Answers: 3
question
Engineering, 04.07.2019 18:20
For each of the following process: a) sketch the p-v diagram, b)sketch t-s diagram, c) sketch t-v diagram, d) sketch the boundary work on one of the diagrams (a, b or c) and e) sketch the reversible heat transfer on one of the diagrams (a, b or c): 1- isobaric process from compressed liquid to superheated vapor 2- isothermal process from compressed liquid to superheated vapor 3- isentropic process from compressed liquid to superheated vapor
Answers: 3
You know the right answer?
25 The following Information is available for a factory,
Daily working hours
8
Numbe...
Questions
question
Biology, 27.08.2020 15:01
question
Physics, 27.08.2020 15:01
question
Mathematics, 27.08.2020 15:01
Questions on the website: 13722363