subject
Engineering, 03.04.2021 06:40 izzybellee20004

Consider 8 processes and find out average wait time from the following table. Consider the Highest Response Ratio Next (HRNN) scheduling algorithm.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
question
Engineering, 04.07.2019 19:20
Apure substance is a)-mixture of various chemical elements or compounds b)-substance that has a fixed chemical composition throughout c)-mixture that is homogeneous (such as air) d)-all the answers
Answers: 3
question
Engineering, 06.07.2019 03:30
The load on a bolt consists of an axial pull of 10 kn together with a transverse shear force of 5 kn. the bolt material has a yield strength of syt syc 100 mpa. find the diameter of the bolt at factor of safety n-0.5, n 1 and n-2 using maximum shear stress theory
Answers: 3
question
Engineering, 06.07.2019 04:10
Agas mixture with a compostion of 55 methane, 30% propane, and 15 butane by volume) is compressed from 1 bar and 25°c to 9bar in a compressor with an isentropic efficiency of 85%. the environment has a temperature of to25 c. determine (a) the exit temperature of the mixture (b) the specific work required to run the compressor (c) the specific entropy generation of the process (d) the specific exergy destruction of the process (e) the second law efficiency of the compressor
Answers: 3
You know the right answer?
Consider 8 processes and find out average wait time from the following table. Consider the Highest...
Questions
question
Mathematics, 28.06.2019 14:00
question
Chemistry, 28.06.2019 14:00
Questions on the website: 13722359