Current situation: Your company, which is a large distributor of medical supplies (injection syringe or Blood collection supplies), supplies these products to large public and private hospitals in Riyadh, Jeddah and Dammam. Your company operates a large distribution centre (DC) in Riyadh and one storage facility in Jeddah. Currently, the quality function at your facilities are quite bad as there are no proper quality systems to control and ensure the quality of storing and delivering these products. Due to the perishable nature of your inventory and bad operational practices, product damage and quality issues are prevalent in your warehouse. All quality-related tasks are carried out by your warehouse operational staff who are not highly trained nor knowledgeable about quality management. There is no dedicated staff to perform the quality operations. Products are moved using manual staff and sometimes using a forklift between the storage shelves and delivery vehicles. Refrigeration sensors and storage on some shelves experience malfunctions in some events without informing the warehouse staff about these technical problems.
2

New situation:
You are tasked with establishing a new quality management department to perform and supervise all quality tasks at your Riyadh’s DC and Jeddah’s facility. So, you need to establish all necessary quality approaches and personnel to ensure the effective storage and delivery of the medical supplies.
Task: You’re are required to review the current operational practices and apply necessary improvements to establish necessary quality management process to ensure high-quality operations for your storage and delivery activities to your customers.
You need to consider the following functions when considering the changes:
1. Quality tools to identify the sources and reasons for the current quality problems in your
operations.
2. What quality standards and approaches will you set and apply in the new quality department?
3. New operational practices and approaches to be applied for quality assurance and quality control?
4. New personnel of the quality department including new hires, job responsibilities, required
qualifications and training.
5. Technologies and systems to be used in ensure quality of your storage and delivery activities
6. Performance management metrics and approaches to monitor and improve the quality and
efficiency of your operations.
Your suggested changes need to be based on your understanding of the course’s lectures and any online content that you find. Additionally, you need to search for relevant references on “quality management in medical industry, quality management of medical supplies” and cite some relevant studies to substantiate and validate your recommended changes.
You can make any logical assumptions and constraints in your suggested solution as long as you fully describe them and provide a good rationale for them.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 03.07.2019 15:10
Two flowing streams of argon gas are adiabatically mixed to form a single flow/stream. one stream is 1.5 kg/s at 400 kpa and 200 c while the second stream is 2kg/s at 500 kpa and 100 ? . it is stated that the exit state of the mixed single flow of argon gas is 150 c and 300 kpa. assuming there is no work output or input during the mixing process, does this process violate either the first or the second law or both? explain and state all your assumptions.
Answers: 1
question
Engineering, 04.07.2019 18:20
Air is compressed isentropically from an initial state of 300 k and 101 kpa to a final temperature of 1000 k. determine the final pressure using the following approaches: (a) approximate analysis (using properties at the average temperature) (b) exact analysis
Answers: 1
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
Current situation: Your company, which is a large distributor of medical supplies (injection syring...
Questions
question
Mathematics, 22.10.2019 09:00
question
Arts, 22.10.2019 09:00
question
Biology, 22.10.2019 09:00
question
Mathematics, 22.10.2019 09:00
Questions on the website: 13722363