A general contractor has received plans for a new high-rise hotel in an urban area. The hotel will be 12 stories tall and will have 144 rooms. The contractor is preparing to make a bid on the project. Among the usual specifications for a high-rise building, the plans detail specifications for a friction pile foundation and a glass curtain wall. First, identify the type of construction (residential, commercial, or industrial) and explain why it fits into that category. Next, explain what materials will be needed for each of the specifications in the plan and what workers will be required to install those materials. Finally, identify how carpenters and ironworkers will contribute to the project and what materials they will need to do their jobs.​

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 03.07.2019 23:20
Two technicians are discussing the intake air temperature (iat) sensor. technician a says that the computer uses the iat sensor as a backup to the engine coolant temperature (ect) sensor. technician b says that the powertrain control module (pcm) will subtract the calculated amount of fuel if the air measures hot. who is correct
Answers: 3
question
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
question
Engineering, 04.07.2019 18:10
An air compression refrigeration system is to have an air pressure of 100 psia in the brine tank and an allowable air temperature increase of 60°f for standard vapor compression cycle temperatures of 77 f entering the expansion cylinder and 14 f entering the compression cylinder, calculate the coefficient of performance a. 2.5 b 3.3 c. 4.0 d. 5.0
Answers: 3
You know the right answer?
A general contractor has received plans for a new high-rise hotel in an urban area. The hotel will b...
Questions
question
Mathematics, 23.07.2019 17:30
Questions on the website: 13722363