7.26 A left-turn movement has a maximum arrival rate of 200 veh/h. The saturation flow of this movement is 1400 veh/h. For this approach, the yellow time is 4 seconds, all-red time is 2 seconds, and total lost time is 3 seconds. The cycle length is 120 seconds. What minimum displayed green time must be provided to ensure that the queue in each cycle clears, and what is the movement's total delay per cycle and delay per vehicle for this green time

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
The y form of iron is known as: a) ferrite b) cementite c) perlite d) austenite
Answers: 3
question
Engineering, 04.07.2019 18:10
Fluids at rest possess no flow energy. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
Carbon dioxide gas expands isotherm a turbine from 1 mpa, 500 k at 200 kpa. assuming the ideal gas model and neglecting the kinetic and potential energies, determine the change in entropy, heat transfer and work for each kilogram of co2.
Answers: 2
question
Engineering, 04.07.2019 18:10
Atmospheric air has a temperature (dry bulb) of 80° f and a wet bulb temperature of 60° f when the barometric pressure is 14.696 psia. determine the specific humidity, grains/lb dry air. a. 11.4 c. 55.8 d. 22.5 b. 44.1
Answers: 1
You know the right answer?
7.26 A left-turn movement has a maximum arrival rate of 200 veh/h. The saturation flow of this movem...
Questions
question
Mathematics, 12.09.2019 01:30
question
Mathematics, 12.09.2019 01:30
question
Mathematics, 12.09.2019 01:30
Questions on the website: 13722361