subject
Engineering, 04.03.2021 23:10 sierravick123owr441

A contractor excavates 10,000 m3 soil at moist unit weight of 17.5 kN/m3 and moisture content of 10% from a borrow pit and transports it to a project site. The project has an area of 20,000 m2 to be filled with this compacted soil. If the required dry unit weight and moisture content of the compacted soil are 18.3 kN/m3 and 12.5% (assume there is no soil loss during transportation and compaction), what is the thickness of the compacted soil and how much water needs to be added?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
question
Engineering, 04.07.2019 18:10
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 18:10
An air compression refrigeration system is to have an air pressure of 100 psia in the brine tank and an allowable air temperature increase of 60°f for standard vapor compression cycle temperatures of 77 f entering the expansion cylinder and 14 f entering the compression cylinder, calculate the coefficient of performance a. 2.5 b 3.3 c. 4.0 d. 5.0
Answers: 3
question
Engineering, 04.07.2019 19:10
What is a monomer? how do they form a ploymer from the view point of chemical bonding?
Answers: 1
You know the right answer?
A contractor excavates 10,000 m3 soil at moist unit weight of 17.5 kN/m3 and moisture content of 10%...
Questions
question
Mathematics, 18.09.2019 22:00
Questions on the website: 13722363