subject
Engineering, 17.02.2021 01:00 kody2lewiskl

Which of the following is NOT an example of a direct cost of workplace injuries? Medical expenses

Workers’ compensation payments

Cost for legal services

Lost productivity

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Heat is added to a piston-cylinder device filled with 2 kg of air to raise its temperature 400 c from an initial temperature of t1 27 cand pressure of pi 1 mpa. the process is isobaric process. find a)-the final pressure p2 b)-the heat transfer to the air.
Answers: 1
question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
A-mn has a cubic structure with a0 0.8931 nm and a density of 7.47 g/cm3. b-mn has a different cubic structure, with a0 0.6326 nm and a density of 7.26 g/cm3. the atomic weight of manganese is 54.938 g/mol and the atomic radius is 0.112 nm. determine the percent volume change that would occur if a-mn transforms to b-mn.
Answers: 2
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
You know the right answer?
Which of the following is NOT an example of a direct cost of workplace injuries? Medical expenses
Questions
question
Mathematics, 21.08.2020 18:01
question
English, 21.08.2020 18:01
question
Spanish, 21.08.2020 18:01
question
Mathematics, 21.08.2020 18:01
question
History, 21.08.2020 18:01
question
Mathematics, 21.08.2020 18:01
Questions on the website: 13722360