Engineering, 13.02.2021 18:10 nehemiahj8

Zack's new home is progressing well, and the foundation work is finished. The general contractor stops by Zack's present home to let him know that the lumber order will be dropped off in two days. Almost as a side comment, the contractor asks if Zack has decided what he wants for wall sheathing. Zack says he is not sure what would be best and asks for a recommendation. What do you think the contractor will offer as options? Which option would be best?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
The y form of iron is known as: a) ferrite b) cementite c) perlite d) austenite
Answers: 3
question
Engineering, 03.07.2019 15:10
Apiston-cylinder with a volume of 0.25 m3 holds 1 kg of air (r 0.287 k/kgk) at a temperature of 100 c. heat transfer to the cylinder causes an isothermal expansion of the piston until the volume triples. how much heat is added to the piston-cylinder?
Answers: 3
question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:10
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
You know the right answer?
Zack's new home is progressing well, and the foundation work is finished. The general contractor sto...
Questions
question
Chemistry, 16.03.2020 09:21
Questions on the website: 13722362