5. An equal-tangent sag vertical curve has an initial grade of -2.5%. It is known that the final grade is positive and that the low point is at elevation 270 feet and station 141 00. The PVT of the curve is at elevation 274 and the design speed of the curve is 35 mi/hr. Determine the station and elevation of the PVC and PVI using the offset method. Do not use the y

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Afour cylinder four-stroke in-line engine has a stroke of 160mm, connecting rod length of 150mm, a reciprocating mass of 3kg and its firing order is 1-3-4-2. the spacing between cylinders is 100mm. i. show that the engine is in balance with regard to the primary inertia forces and primary 3. a and secondary inertia couples. li determine the out of balance secondary inertia force ii. propose ways of balancing this out of balance force and discuss the challenges that will arise
Answers: 3
question
Engineering, 04.07.2019 18:10
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
question
Engineering, 04.07.2019 18:20
Modern high speed trains do not have perpendicular expansion gaps where rails are joined end-to-end any more they are mostly welded together but what might happen if there was a spell of particularly hot weather that causes inspection of the tracks?
Answers: 1
question
Engineering, 04.07.2019 19:10
When subject to a steady load (within elastic range) over a long period of time, what is the major difference in material behavoir between steel and plastic?
Answers: 2