A two man carpenter crew sets approximately 725 sq. Ft. Of concrete forms per day. If they have erected 2/5 of this amount how many square feet of forming remain to be done today?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 23:20
Two technicians are discussing the intake air temperature (iat) sensor. technician a says that the computer uses the iat sensor as a backup to the engine coolant temperature (ect) sensor. technician b says that the powertrain control module (pcm) will subtract the calculated amount of fuel if the air measures hot. who is correct
Answers: 3
question
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
question
Engineering, 04.07.2019 08:10
Which of the following is an easy way to remember the modified “x” tire rotation? a. nondrive wheels straight, cross the drive wheels b. drive wheels straight, cross the nondrive wheels c. drive wheels crossed, nondrive wheels straight d. drive wheels crossed, nondrive wheels crossed
Answers: 1
question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
You know the right answer?
A two man carpenter crew sets approximately 725 sq. Ft. Of concrete forms per day. If they have erec...
Questions
question
Biology, 31.08.2019 09:10
question
Mathematics, 31.08.2019 09:10
question
History, 31.08.2019 09:20
question
Mathematics, 31.08.2019 09:20
Questions on the website: 13722362