subject
Engineering, 09.02.2021 05:00 francisco42002

When preparing to begin a earth moving project that will require at least 2 years of site preparations and million tons of material has to be relocated and some blasting from solid rock
will be a part of the process. I have given you several steps that are required before and during
the process. Put them in order and give a short description of what work and preparation will
need to be completed in each step.
1. You will need to acquired the property and mineral rights or have a contract to perform
all said work described in the contract. Write down some considerations that are a must
happen before entering the property with a piece of equipment.
Call the wife and make plans for supper.
Call 811
Call the power company
Call an engineering firm.
Get in touch with the local fire department.
Get in touch with the highway department.
Get in touch with the county road department.
Check the weight limits on any bridges that have to be crossed with equipment our
trucks hauling materials.
Get in touch with the local hardware and set up an account.
Find an equipment dealership to purchase parts when needed to repair equipment.
Get in touch with the local unemployment office to set up a hiring event.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Afour cylinder four-stroke in-line engine has a stroke of 160mm, connecting rod length of 150mm, a reciprocating mass of 3kg and its firing order is 1-3-4-2. the spacing between cylinders is 100mm. i. show that the engine is in balance with regard to the primary inertia forces and primary 3. a and secondary inertia couples. li determine the out of balance secondary inertia force ii. propose ways of balancing this out of balance force and discuss the challenges that will arise
Answers: 3
question
Engineering, 04.07.2019 18:20
Athin walled concentric tube exchanger is used to cool engine oil from 160°c to 60°c with water that is available at 25°c acting as a coolant. the oil and water flow rates are each at 2 kg/s, and the diameter of the inner tube is 0.5 m and the corresponding value of the overall heat transfer coefficient is 250 w/m2. oc. how long must the heat exchanger be to accomplish the desired cooling? cpwater=4.187 kj/kg-candcpengine el=2.035 kj/kg·°c, oil . 120]
Answers: 1
question
Engineering, 04.07.2019 19:10
Tom is having a problem with his washing machine. he notices that the machine vibrates violently at a frequency of 1500 rpm due to an unknown rotating unbalance. the machine is mounted on 4 springs each having a stiffness of 10 kn/m. tom wishes to add an undamped vibration absorber attached by a spring under the machine the machine working frequency ranges between 800 rpm to 2000 rpm and its total mass while loaded is assumed to be 80 kg a) what should be the mass of the absorber added to the machine so that the natural frequency falls outside the working range? b) after a first trial of an absorber using a mass of 35 kg, the amplitude of the oscillation was found to be 10 cm. what is the value of the rotating unbalance? c) using me-3.5 kg.m, find the optimal absorber (by minimizing its mass). what would be the amplitude of the oscillation of the absorber?
Answers: 3
question
Engineering, 04.07.2019 19:20
A21-tooth spur pinion mates with a 28-tooth gear. the diametral pitch is 3 teeth/in and the pressure angle is 20°, find the following values: the addendum, dedendum, circular pitch, tooth thickness, and base circle diameters.
Answers: 2
You know the right answer?
When preparing to begin a earth moving project that will require at least 2 years of site preparati...
Questions
question
Mathematics, 19.03.2021 01:00
question
Mathematics, 19.03.2021 01:00
question
Mathematics, 19.03.2021 01:00
question
History, 19.03.2021 01:00
Questions on the website: 13722360