subject
Engineering, 09.02.2021 02:00 mdsulli99

Soil having a void ratio of 0.68 as it exists in a bor- row pit is to be excavated and transported to a fill site where it will be compacted to a void ratio of 0.45. The volume of fill required is 2500 m3 . Find the volume of soil that must be excavated from the borrow pit to furnish the required volume of fill.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Which of the following refers to refers to how well the control system responds to sudden changes in the system. a)-transient regulation b)- distributed regulation c)-constant regulation d)-steady-state regulation
Answers: 1
question
Engineering, 04.07.2019 18:20
Inadequate stores control is not an obstacle to effective work order system. (clo4) a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 19:10
Apressure vessel with an r/t 20 cannot be treated as thin walled vessel. a)-trune b)- false
Answers: 3
question
Engineering, 04.07.2019 19:20
Aseries piping system conveys methyl alcohol. the system consists of 70 m of 1- nominal pipe follow by 50 m of 2-nominal pipe, both schedule 40 commercial steel. the 1-nominal pipe contains 3 90° elbows (regular) anda fully open gate valve, all threaded. the pressure drop through the system is 150 kpa. determine the volume flow rate through the system that is horizontally laid.
Answers: 1
You know the right answer?
Soil having a void ratio of 0.68 as it exists in a bor- row pit is to be excavated and transported t...
Questions
question
History, 25.10.2019 09:43
question
History, 25.10.2019 09:43
question
Chemistry, 25.10.2019 09:43
Questions on the website: 13722363