Engineering, 04.02.2021 03:30 Heyitsbrandi
Problem 3.10 One/half million parts of a certain type are to be manufactured annually on dedicated production machines that run 16 hours per day, five days per week, 50 weeks per year. (a) The cycle time to produce one part is 1.8 min. If availability and utilization are each 100%, and setup time is neglected, how many of the machines will be required to satisfy demand? (b) Solve part (a) except that availability = 95%.
Answers: 3
Engineering, 04.07.2019 18:10
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
Engineering, 04.07.2019 19:10
In general, how do thermosetting plastics compare to thermoplastics in mechanical and physical properties?
Answers: 3
Engineering, 04.07.2019 19:10
Apressure vessel with an r/t 20 cannot be treated as thin walled vessel. a)-trune b)- false
Answers: 3
Engineering, 04.07.2019 19:10
The maximum shear stress and maximum flexural stress occur at the same location along a beam subjected to a non-uniform bending load. a)-trune b)- false
Answers: 2
Problem 3.10 One/half million parts of a certain type are to be manufactured annually on dedicated p...
Mathematics, 30.09.2019 19:00
Mathematics, 30.09.2019 19:00
Physics, 30.09.2019 19:00
Mathematics, 30.09.2019 19:00
Mathematics, 30.09.2019 19:00
Engineering, 30.09.2019 19:00
English, 30.09.2019 19:00
Mathematics, 30.09.2019 19:00
Geography, 30.09.2019 19:00