subject
Engineering, 04.02.2021 03:30 kingje1477

In a certain week, a production schedule for a certain department shows the following parts being produced: 540 parts of type A, 1200 parts of type B, 490 parts of type C, and 780 parts of type D. The respective production times for these parts are the following: TpA = 5.28 min, TpB = 2.86 min, TpC = 4.65 min, and TpD = 3.22 min. Determine the workload for this department in hours per week.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
Carbon dioxide gas expands isotherm a turbine from 1 mpa, 500 k at 200 kpa. assuming the ideal gas model and neglecting the kinetic and potential energies, determine the change in entropy, heat transfer and work for each kilogram of co2.
Answers: 2
question
Engineering, 04.07.2019 18:10
Shafts are machine elements that are used to a) carry axial loads b) direct shear loads c) transmit power d) rotate at constant speed e) none of the above circular and square shafts subjected to the same torque under the same circum behave a) the same way b) almost the same way
Answers: 2
You know the right answer?
In a certain week, a production schedule for a certain department shows the following parts being pr...
Questions
question
Physics, 24.06.2019 20:20
question
Mathematics, 24.06.2019 20:20
Questions on the website: 13722360