subject
Engineering, 21.12.2020 19:30 mildred3645

Vehicles arrive at a recreational park booth at a uniform deterministic rate of 5 veh/min. If uniform deterministic processing of vehicles (collecting of fees) begins 20 minutes after the first arrival and the total delay is 3200 veh/min, how long after the arrival of the first vehicle will it take for the queue to be cleared?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
question
Engineering, 04.07.2019 18:20
Inadequate stores control is not an obstacle to effective work order system. (clo4) a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 18:20
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
question
Engineering, 04.07.2019 18:20
A2-m rigid tank initially contains saturated water vapor at 100 kpa. the tank is connected to a supply line through a valve. steam is flowing in the supply line at 600 kpa and 300 c. the valve is opened, and steam is allowed to enter the tank until the pressure in the tank reaches the line pressure, at which point the valve is closed. a thermometer placed in the tank indicates that the temperature at the final state is 200°c. determine (a) the mass of steam that has entered the tank (b) the amount of heat transfer.
Answers: 3
You know the right answer?
Vehicles arrive at a recreational park booth at a uniform deterministic rate of 5 veh/min. If unifor...
Questions
question
Mathematics, 08.07.2019 17:30
question
History, 08.07.2019 17:30
question
History, 08.07.2019 17:30
Questions on the website: 13722361