subject
Engineering, 04.12.2020 02:50 CheddaDsk

1) FIND THE TOTAL RESISTANCE AND TOTAL CURRENT FOR THE SYSTEM IN
FIG 1
150 Ω
ν
Λ
300 Ω
75 Ω
30 V
450 Ω
150 Ω
Λ
50 Ω
FIGURE 1
Adtivate Windows

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
question
Engineering, 04.07.2019 18:20
Athin walled concentric tube exchanger is used to cool engine oil from 160°c to 60°c with water that is available at 25°c acting as a coolant. the oil and water flow rates are each at 2 kg/s, and the diameter of the inner tube is 0.5 m and the corresponding value of the overall heat transfer coefficient is 250 w/m2. oc. how long must the heat exchanger be to accomplish the desired cooling? cpwater=4.187 kj/kg-candcpengine el=2.035 kj/kg·°c, oil . 120]
Answers: 1
question
Engineering, 04.07.2019 19:10
Arigid tank contains 10 kg of air at 137 kpa (abs) and 21°c. more air is added to the tank until the pressure and temperature rise to 242 kpa (abs) and 32°c, respectively. determine the amount of air added to the tank. [r-0.287 kj/kg k]
Answers: 3
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
1) FIND THE TOTAL RESISTANCE AND TOTAL CURRENT FOR THE SYSTEM IN
FIG 1
150 Ω
ν
Questions
question
Mathematics, 09.01.2021 01:00
question
Chemistry, 09.01.2021 01:00
question
Health, 09.01.2021 01:00
question
Mathematics, 09.01.2021 01:00
question
Mathematics, 09.01.2021 01:00
question
Mathematics, 09.01.2021 01:00
question
Mathematics, 09.01.2021 01:00
question
History, 09.01.2021 01:00
Questions on the website: 13722361