subject
Engineering, 16.11.2020 17:00 Hudman57

A Y-connected of three identical 100-kVA 7967/277 V transformers is supplied with power directly from a large constant-voltage bus. In the short-circuit test, the recorded values on the high- voltage side for one of these transformers are: VSC = 560 V ISC = 12.6 A PSC = 3300 W (a) If this bank delivers a rated load at 0.88 PF lagging and rated voltage, what is the line-to-line voltage on the primary of the transformer bank?(b) What is the voltage regulation under these conditions?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
question
Engineering, 04.07.2019 18:10
Courses that are developed by subject matter experts, internal or extemal to the college or university. these programs are marketed by the school (clo2) marks a)-vocational schools b)-vendor training c)-colleges & universities d)-continuing education programs
Answers: 2
question
Engineering, 04.07.2019 18:20
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 19:20
Apure substance is a)-mixture of various chemical elements or compounds b)-substance that has a fixed chemical composition throughout c)-mixture that is homogeneous (such as air) d)-all the answers
Answers: 3
You know the right answer?
A Y-connected of three identical 100-kVA 7967/277 V transformers is supplied with power directly fro...
Questions
question
Mathematics, 22.01.2021 14:00
question
History, 22.01.2021 14:00
question
Mathematics, 22.01.2021 14:00
question
English, 22.01.2021 14:00
question
Mathematics, 22.01.2021 14:00
question
History, 22.01.2021 14:00
Questions on the website: 13722363