subject
Engineering, 12.11.2020 19:10 DefineSilver3837

From the data listed, use the average area method to calculate cut, fill, and cumulative volumes in cubic yards between stations 10 00 and 20 00. Use an expansion factor of 1.50 for fills. Station Cut Fill 10 00 0 11 00 174 12 00 348 13 00 371 14 00 146 14 20 0 0 15 00 142 16 00 23817 00 305 18 00 247 19 00 138 20 00 106

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 18:10
Different types of steels contain different elements that alter the characteristics of the steel. for each of the following elements, explain what the element does when alloyed with steel.
Answers: 2
question
Engineering, 04.07.2019 18:10
Water at the rate of 1 kg/s is forced through a tube with a 2.5 cm inner diameter. the inlet water temperature is 15°c, and the outlet water temperature is 50°c. the tube wall temperature is 14°c higher than the local water temperature all along the length of the tube. what is the length of the tube?
Answers: 3
question
Engineering, 04.07.2019 18:20
Steam enters a converging nozzle at 3.0 mpa and 500°c with a at 1.8 mpa. for a nozzle exit area of 32 cm2, determine the exit velocity, mass flow rate, and exit mach number if the nozzle: negligible velocity, and it exits (a) is isentropic (b) has an efficiency of 94 percent
Answers: 2
You know the right answer?
From the data listed, use the average area method to calculate cut, fill, and cumulative volumes in...
Questions
question
German, 08.06.2021 18:10
question
Mathematics, 08.06.2021 18:10
question
Chemistry, 08.06.2021 18:10
question
Mathematics, 08.06.2021 18:10
question
Chemistry, 08.06.2021 18:10
Questions on the website: 13722367