Which of the following tasks might a civil engineer perform during a project’s construction phase in a design-build approach? (Select all that apply.) Work with construction management to solve specific problems as they arise.

Draw up the contracts for construction management.

Ensure compliance with safety standards.

Provide information on design changes.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
An ideal otto cycle with air as the working fluid has a compression ratio of 8. the minimum and maximum temperatures in the cycle are 300 k and 1340 k. use constant specific heats at room temperature to determine (a) the amount of heat transferred to the air during the heat- addition kj/kg, (b) the thermal efficiency, and (c) the thermal efficiency of a carnot cycle ope limits. process, in rating between the same temperature
Answers: 2
question
Engineering, 04.07.2019 18:20
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
question
Engineering, 04.07.2019 18:20
An engine runs on the ideal diesel cycle. the cycle has a compression ratio of 20 and a cutoff ratio of 2. the highest temperature in the cycle is 1200 k. if the heat into the system is 300 kj/kg of working fluid and using variable specific heats determine the work produced per mass of working fluid
Answers: 3
You know the right answer?
Which of the following tasks might a civil engineer perform during a project’s construction phase in...
Questions
question
Mathematics, 10.08.2021 05:00
question
Mathematics, 10.08.2021 05:00
Questions on the website: 13722362