Engineering, 23.10.2020 15:20 justincsh7238

considering two parts with constant failure rates and MTTF equal to 909.09 days and 1428.57 days. Q4) Compute the reliability of each part at 300 days. Q5) Calculate high redundancy and low redundancy reliability of the system at 300 days.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
Air is to be cooled in the evaporator section of a refrigerator by passing it over a bank of 0.8-cm-outer-diameter and 0.4-m-long tubes inside which the refrigerant is evaporating at -20°c. air approaches the tube bank in the normal direction at 0°c and 1 atm with a mean velocity of 4 m/s. the tubes are arranged in-line with longitudinal and transverse pitches of sl- st 1.5 cm. there are 30 rows in the flow direction with 15 tubes in each row. determine (a) the refrigeration capacity of this system and (b) pressure drop across the tube bank. evaluate the air properties at an assumed mean temperature of -5°c and 1 atm. is this a good assumption?
Answers: 1
question
Engineering, 04.07.2019 18:10
Afull journal bearing has a journal diameter of 27 mm, with a unilateral tolerance of -0.028 mm. the bushing bore has a diameter of 27.028 mm and a unilateral tolerance of 0.04 mm. the l/d ratio is 0.5. the load is 1.3 kn and the journal runs at 1200 rev/min. if the average viscosity is 50 mpa-s, find the minimum film thickness, the power loss, and the side flow for the minimum clearance assembly.
Answers: 1
question
Engineering, 04.07.2019 18:10
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
You know the right answer?
considering two parts with constant failure rates and MTTF equal to 909.09 days and 1428.57 days. Q4...
Questions
question
Geography, 05.05.2020 15:28
question
Mathematics, 05.05.2020 15:28
question
Mathematics, 05.05.2020 15:28
question
Mathematics, 05.05.2020 15:28
question
Mathematics, 05.05.2020 15:28
question
English, 05.05.2020 15:28
Questions on the website: 13722367