subject
Engineering, 17.10.2020 19:01 davismar3

Assume that 20 percent of the dynamic count of the instructions executed for a program are branch instructions. Delayed branching is used, with one delay slot. Assume that there are no stalls caused by other factors. First, derive an expression for the execution time in cycles if all delay slots are filled with NOP instructions. Then, derive another expression that reflects the execution time with 70 percent of delay slots filled with useful instructions by the optimizing compiler. From these expressions, determine the compiler’s contribution to the increase in performance, expressed as a speedup percentage.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 18:10
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
question
Engineering, 04.07.2019 18:10
True or false (explain) (110)[111] is a slip system in bcc metals . the {111} family in fcc contains 8 planes. resolved shear stress (rss) in single crystals is just related to the applied stress. critical resolved shear stress (crss) in single crystal metals is direct proportional to the number of defects in the structure
Answers: 2
question
Engineering, 04.07.2019 18:20
Acertain flow of air (at stp) has a velocity distribution given by v i (in ft/s). if this flow is going through a 4 ft square area in the yz-plane (centered at the origin), what is the mass flow rate (in lbm/s)?
Answers: 2
You know the right answer?
Assume that 20 percent of the dynamic count of the instructions executed for a program are branch in...
Questions
Questions on the website: 13722360