Engineering, 07.10.2020 14:01 Brennen432

A civil engineer is performing a tensile test on a brick. Immediately after he adds the first weight, the brick splits into two parts. Why did this happen?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 18:10
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
question
Engineering, 04.07.2019 18:10
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
You know the right answer?
A civil engineer is performing a tensile test on a brick. Immediately after he adds the first weight...
Questions
question
Social Studies, 30.03.2021 04:00
question
Mathematics, 30.03.2021 04:00
question
Mathematics, 30.03.2021 04:00
Questions on the website: 13722363