An automobile has just dropped into a river. The car door is approximately a rectangle, measures 36 in. wide and 40 in. high, and hinges on a vertical side. The water level inside the car is up to the midheight of the door, and the air inside the car is at atmospheric pressure. Calculate the force required to open the door if the force is applied 24 in. from the hinge line. See Fig. P2.78. (The driver did not have the presence of mind to open the window to escape.)

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 18:20
Refrigerant-134a enters the compressor of a refrigerator as superheated vapor at 0.14 mpa and -10°c at a rate of 0.05 ka/s and leaves at 0.8 mpa and 50°c. the refrigerant is cooied in the condenser to 0.72 mpa and 26'c. it is then throttled to 0.15 mpa. sketch the t-s diagram for the system and evaluate: 6) the rate of heat removai from the refrigerated space (kw), it) the power input to the compressor (kw), ii) the isentropic efficiency of the compressor (%), and iv) the cop of the refrigerator.
Answers: 2
question
Engineering, 04.07.2019 18:20
An open feedwater heater operates at steady state with liquid entering at inlet 1 with t? = 40°c and pl = 1 .2 mpa. water vapor att2-200°c and p2 = 1.2 mpa enters at inlet 2. saturated liquid water exits with a pressure of pa 1.2 mpa. neglect heat transfer with the surroundings and all kinetic and potential energy effects, determine the mass flow rate of steam at inlet 2 if the mass flow rate of liquid water at inlet 1 is given as 2 kg/s.
Answers: 3
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
An automobile has just dropped into a river. The car door is approximately a rectangle, measures 36...
Questions
question
English, 27.06.2020 07:01
question
Arts, 27.06.2020 07:01
question
Mathematics, 27.06.2020 07:01
Questions on the website: 13722361