subject
Engineering, 08.09.2020 15:01 VamPL

What should be done after reaching the required recovery vacuum on an appliance?A. Immediately disconnect the recycling or recovery equipment, and open the system for service. B. Wait for at least a few minutes to see if the system pressure rises. C. Break the vacuum with nitrogen and open the system for service. D. Pressurize the system with nitrogen and perform a leak check.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Which of the following refers to refers to how well the control system responds to sudden changes in the system. a)-transient regulation b)- distributed regulation c)-constant regulation d)-steady-state regulation
Answers: 1
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
question
Engineering, 04.07.2019 18:20
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
question
Engineering, 04.07.2019 19:10
The maximum shear stress and maximum flexural stress occur at the same location along a beam subjected to a non-uniform bending load. a)-trune b)- false
Answers: 2
You know the right answer?
What should be done after reaching the required recovery vacuum on an appliance?A. Immediately disco...
Questions
question
Biology, 21.02.2021 08:30
question
Physics, 21.02.2021 08:30
question
Mathematics, 21.02.2021 08:30
question
Mathematics, 21.02.2021 08:30
question
Mathematics, 21.02.2021 08:30
Questions on the website: 13722367