If a scope's sweep time control is set for 5 mS and the displayed signal covers four divisions to make one full waveform, what is the total elapsed time of one cycle? A. 40mS
B. 20mS
C. 5mS
D. 10mS

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
question
Engineering, 04.07.2019 18:10
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
question
Engineering, 04.07.2019 18:10
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
question
Engineering, 04.07.2019 18:10
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factor·n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed.gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
You know the right answer?
If a scope's sweep time control is set for 5 mS and the displayed signal covers four divisions to ma...
Questions
question
History, 07.12.2020 19:30
question
Spanish, 07.12.2020 19:30
question
Mathematics, 07.12.2020 19:30
question
Arts, 07.12.2020 19:30
Questions on the website: 13722360