subject
Engineering, 19.08.2020 21:01 hardwick744

Alphah company has implemented a plan whereby functional manager will be held toatally responsible for all cost overrunr against their (the functional managers') original estamates. Furthermore, all cost overruns must com out of the functional managers' budgets. Whether they be overhead or otherwise, not the project budget. what atr the advantages and disadvantages of this approach?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aplate clutch has a single pair of mating friction surfaces 250-mm od by 175-mm id. the mean value of the coefficient of friction is 0.30, and the actuating force is 4 kn. a) find the maximum pressure and the torque capacity using the uniform-wear model. b) find the maximum pressure and the torque capacity using the uniform-pressure model.
Answers: 3
question
Engineering, 04.07.2019 18:10
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
question
Engineering, 04.07.2019 18:20
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
question
Engineering, 04.07.2019 18:20
Wiy doeres rere okhn a pump whon working betwon the same pressure range?
Answers: 2
You know the right answer?
Alphah company has implemented a plan whereby functional manager will be held toatally responsible f...
Questions
question
Mathematics, 22.06.2019 03:30
Questions on the website: 13722361