Engineering, 05.08.2020 17:01 shadenShaden2037

If a scope's sweep time control is set for 5 mS and the displayed signal covers four divisions to make one full waveform, what is the total elapsed time of one cycle? A. 40mS
B. 20mS
C. 5mS
D. 10mS

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 08:10
Which of the following is an easy way to remember the modified “x” tire rotation? a. nondrive wheels straight, cross the drive wheels b. drive wheels straight, cross the nondrive wheels c. drive wheels crossed, nondrive wheels straight d. drive wheels crossed, nondrive wheels crossed
Answers: 1
question
Engineering, 04.07.2019 18:10
Items are similar to the free issue items, but their access is limited. (clo5) a)-bin stock items free issue b)-bin stock controlled issue c)-critical or insurance spares d)-rebuildable spares e)-consumables
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
question
Engineering, 04.07.2019 18:10
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
You know the right answer?
If a scope's sweep time control is set for 5 mS and the displayed signal covers four divisions to ma...
Questions
question
World Languages, 15.04.2020 20:09
question
Mathematics, 15.04.2020 20:09
question
Mathematics, 15.04.2020 20:10
Questions on the website: 13722360