subject
Engineering, 27.06.2020 02:01 taylordalton93

Please describe a situation from your work experiences in which you believe there was poor cost estimating. Please give a brief overview of the situation, why you believe there was poor cost estimating, and any results from this poor cost estimating. Note: this is a very open-ended problem.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 18:10
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
question
Engineering, 04.07.2019 18:10
Courses that are developed by subject matter experts, internal or extemal to the college or university. these programs are marketed by the school (clo2) marks a)-vocational schools b)-vendor training c)-colleges & universities d)-continuing education programs
Answers: 2
question
Engineering, 04.07.2019 18:20
An engine runs on the ideal diesel cycle. the cycle has a compression ratio of 20 and a cutoff ratio of 2. the highest temperature in the cycle is 1200 k. if the heat into the system is 300 kj/kg of working fluid and using variable specific heats determine the work produced per mass of working fluid
Answers: 3
You know the right answer?
Please describe a situation from your work experiences in which you believe there was poor cost esti...
Questions
question
History, 27.08.2019 18:30
question
Computers and Technology, 27.08.2019 18:30
question
Social Studies, 27.08.2019 18:30
Questions on the website: 13722363