A heavy construction firm has been awarded a contract to build a large concrete dam. It is expected that a total of 8 years will be required to complete the work. The firm will buy $600,000 worth of special equipment for the job. During the preparation of the job cost estimate, the following utilization schedule was computed for the special equipment: Year Utilization (hr/yr)
1 6000
2 4000
3 4000
4 1600
5 800
6 800
7 2200
8 2200
At the end of the job, it is estimated that the equipment can be sold at auction for $60,000.
(a) Compute the sum-of-years-digits' depreciation schedule.
(b) Compute the unit-of-production depreciation schedule

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 23:20
Two technicians are discussing the intake air temperature (iat) sensor. technician a says that the computer uses the iat sensor as a backup to the engine coolant temperature (ect) sensor. technician b says that the powertrain control module (pcm) will subtract the calculated amount of fuel if the air measures hot. who is correct
Answers: 3
question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
question
Engineering, 04.07.2019 18:20
Along 8-cm diameter steam pipe whose external surface temperature is 900c connects two buildings. the pipe is exposed to ambient air at 70c with a wind speed of 50 km/hr blowing across the pipe. determine the heat loss from the pipe per unit length. (b) air at 500c enters a section of a rectangular duct (15 cm x 20 cm) at an average velocity of 7 m/s. if the walls of the duct are maintained at 100c. a) the length of the tube for an exit temperature of the air to be 40 0c. b)the rate of heat transfer from the air. c) the fan power needed to overcome the pressure drop in this section of the duct.
Answers: 1
You know the right answer?
A heavy construction firm has been awarded a contract to build a large concrete dam. It is expected...
Questions
question
Chemistry, 17.05.2021 14:00
question
Business, 17.05.2021 14:00
Questions on the website: 13722359