subject
Engineering, 11.06.2020 23:57 bnvghnbbb

It is desired to produce 5 cubic yards of concrete with a ratio of 1:1.8:3.5 (by weight) of cement, sand, and gravel. What are the required amounts of the components if 5.5 gallons of water per sack of cement is to be used? Assume the free moisture contents of the sand and gravel are 3% and 0.75% respectively. The specific gravities of the cement, sand, and gravel are 3.15, 2.65, and 2.65 respectively. (1 sack of cement weighs 94lb, and 1ft3 of water=7.48 gallons). Give the answere for cement in

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
question
Engineering, 04.07.2019 18:10
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
question
Engineering, 04.07.2019 18:10
Machinery that is a key part of the process and without which the plant or process cannot function is classifed as: (clo4) a)-critical machinery b)-essential machinery c)-general purpose machinery d)-none of the specified options.
Answers: 1
You know the right answer?
It is desired to produce 5 cubic yards of concrete with a ratio of 1:1.8:3.5 (by weight) of cement,...
Questions
question
Geography, 04.03.2021 22:30
question
Biology, 04.03.2021 22:30
question
Mathematics, 04.03.2021 22:30
Questions on the website: 13722362