Engineering, 03.06.2020 12:58 vanessafalcon1198

A hydroelectric plant with a power-generation capacity of 12 MW costs $20 million to install. The fixed charge rate is 7.0 percent, the annual operation and maintenance cost is assumed to be 1.0 percent of the initial cost and the levelized replacement cost is averaged over an expected 40-year lifetime. If the capacity factor for this plant is 0.38, what is the cost of energy?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:20
How much power could a wind turbine produce if it had the following specifications? cp = 0.45 -d=1.2kg/m3 d=50m v 5m/s
Answers: 2
question
Engineering, 04.07.2019 19:20
Determine the time of the day and month of the year at which the peak sensible cooling load occurs for a top floor, north-eastern corner room of an office building in durban for the following conditions: floor area: 8 x 8 x 3 m east and north walls: 115 mm face brick (outside), 20 mm air space, 115 mm ordinary brick (inside) with 15 mm plaster roof construction: suspended plasterboard ceiling, 450 mm air space, 150 mm concrete, 75mm screed, waterproofing no heat transfer across other surfaces window area 3x 1,5 m high in north wall only. ordinary glass with venetian blinds. lights and occupants : from 07: 00 to 18: 00 average light density: 25 w/m2 number of occupants : 5 seated, light office work room temperature 24°c
Answers: 3
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
question
Engineering, 06.07.2019 02:30
Around steel bar, made from material with a yield stress of 750mpa, is loaded so that it has stresses co locations of maximum normal stress and maximum shear stress. use maximum shear stress and maximum distortion energy theories to calculate the safety factors for initial yielding failures.
Answers: 3
You know the right answer?
A hydroelectric plant with a power-generation capacity of 12 MW costs $20 million to install. The fi...
Questions
question
Mathematics, 10.03.2020 07:02
Questions on the website: 13722361