subject
Engineering, 27.05.2020 21:59 joelpimentel

A small-scale wind turbine with the rotor diameter 1.5m uses a 500-Watt DC motor as a generator. Find the capacity factor for the machine if it delivers 100 kWh in a 30-day month. Under the standard condition of 15C temperature and 1 atm pressure, how fast would the wind have to blow for the turbine to generate half of its rate power if the machine is 30% efficient at that point

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:20
For a gate width of 2 m into the paper, determine the force required to hold the gate abc at its location.
Answers: 1
question
Engineering, 04.07.2019 19:10
The sum of the normal stresses does not change as the stress state rotates through an angle. a)-trune b)- false
Answers: 2
question
Engineering, 04.07.2019 19:10
When subject to a steady load (within elastic range) over a long period of time, what is the major difference in material behavoir between steel and plastic?
Answers: 2
You know the right answer?
A small-scale wind turbine with the rotor diameter 1.5m uses a 500-Watt DC motor as a generator. Fin...
Questions
question
Mathematics, 30.03.2021 17:00
question
Mathematics, 30.03.2021 17:00
question
Mathematics, 30.03.2021 17:00
question
Mathematics, 30.03.2021 17:00
question
Mathematics, 30.03.2021 17:00
Questions on the website: 13722359